Method Statement for Painting Works – Internal Wall Painting

Construction workers wearing safety helmets and reflective vests painting interior walls of a building; one painter kneeling with a brush, another mixing paint in a bucket, and two workers using rollers near a ladder, with a banner reading “Method Statement for Painting Work” above them.

This Method Statement for Painting Work outlines the step-by-step process, responsibilities, materials, equipment, safety measures, and inspection criteria involved in delivering high-quality painting works. It serves as a guide for engineers, supervisors, quality inspectors, and subcontractors to ensure that work is carried out efficiently, safely, and in full compliance with relevant standards and client expectations.

1. Purpose

The purpose of this Method Statement is to define the procedure for executing Internal Painting Works with proper supervision and quality control measures at the project.

2. Scope of Work

This method statement covers surface preparation, material handling, application procedure, and final inspection related to wall painting works.

3. References & Standards

  • Contract Specifications
  • Approved GFC Drawings
  • Manufacturer’s Technical Data Sheet
  • IS 15489 – Plastic Emulsion Paint Specification
  • Manufacturer’s Recommendations
  • MSDS (Material Safety Data Sheet)
  • HIRA

4. Materials

  • Approved make Primer, Putty & Emulsion Paint
  • Paint and Putty samples must match the approved Mock-Up

5. Material Delivery & Storage

  • Transport paint, primer, and putty safely to prevent damage.
  • Store materials on raised platforms away from ground contact.
  • Keep materials in a designated storage zone near the work area to minimize handling distance.

6. Manpower

  • Project Engineer
  • Site Engineers
  • Supervisors
  • Foremen
  • QC Inspectors
  • Skilled Masons/Painters
  • Helpers
  • Safety Officer

7. Responsibilities

The Project Manager/Construction Manager is responsible for the full execution of this method statement. Site Engineers shall ensure proper layout, supervision, and adherence to quality. QC Engineers shall inspect materials and verify compliance. Safety officers shall enforce safety measures.

8. Equipment & Tools

  • Buckets
  • Scaffolding
  • Brushes & Rollers
  • Paint Sprayers
  • Sand Paper
  • Putty Knife / Shovel
  • Masking Tape

9. Work Procedure

Click here to discover why quality is the backbone of every successful construction project.

Sign up to download the full customizable Method Statement for Painting works in Word format.